Russel Square

Posted on 11th December, 2011

Cobra Steel are currently erecting 38t of structural steelwork inside the 5th floor of an office block in central London.

The steelwork is being lifted to the 5th floor via a hoist, then moved into the building and erected using mechanical aids and manual handling methods.

Photos to follow.

Make A Comment

Characters left: 2000

Comments (0)